Item 8.4 - Attachment 2 |
Draft Action Plan |
Attachment 2
Granville Pedestrian Movement, Parking
and Transport Study
Draft Action Plan
MapRef |
Description of Recommendations |
Category |
Comments |
Next Steps |
1. |
South Street Part
closure (between Railway Parade and |
Pedestrian improvement |
Closure not to be considered due to Crime Prevention issues and community feedback. |
Extension of footpath to be considered in Stage 3 of South Street upgrade |
2. |
South Street Raised Pedestrian crossing |
Pedestrian improvement |
Safety on current crossing an ongoing issue and relocation is desirable |
Relocation of crossing to be considered in Stage 3 of South Street upgrade |
3. |
Railway Square |
Pedestrian improvement |
Would require acquisition of one retail shopfront. |
To be considered in MoT Interchange upgrade and Hub Feasibility Study |
4. |
Two way rationalised Bus Interchange |
Public Transport |
Need to ensure good long term outcomes for this site |
To be considered in MoT Interchange upgrade and Hub Feasibility Study |
5. |
40 Kmh zone in Town Centre |
Traffic |
Will be considered with streetscape improvements and by Traffic Committee |
Referred to Project
Manager of |
6. |
|
Pedestrian Improvement |
This was considered
in community consultation for the |
Stage 2 will begin construction in May 2009 and Stage 3 is part of the rolling works program for 2009/10 and subject to a funding application with the Federal Government |
7. |
South and |
Traffic |
This was considered
in community consultation for the |
Stage 2 will begin construction in May 2009 and Stage 3 is part of the rolling works program for 2009/10 and subject to a funding application with the Federal Government |
Ref |
Description |
Category |
Comments |
Next Steps |
8. |
South Street Crossing (southern end) |
Traffic |
This was considered
in community consultation for the |
Stage 2 will begin construction in May 2009 and Stage 3 is part of the BNP rolling works program for 2009/10 |
9. |
Interchange Car Park (32 spaces) |
Parking |
This would cost approximately $200k as an interim measure. Discussions are ongoing with the NSW Gov regarding funding for commuter parking in Granville |
To be considered in MoT Interchange upgrade and Hub Feasibility Study |
10. |
Memorial Drive angled parking (30 spaces) |
Parking |
Discussions are ongoing with the NSW Government regarding funding for commuter parking in Granville |
To be referred to MoT to be considered in Interchange upgrade |
11. |
|
Pedestrian improvement |
|
To be referred to MoT to be considered in Interchange upgrade |
12. |
Railway Station Stairs and Lift (removal of stairs and ramps) |
Pedestrian improvement |
Any upgrade to these facilities must integrate with a proposed Community Hub |
To be considered in MoT Interchange upgrade and Hub Feasibility Study |
13. |
Improved Pedestrian
link to |
Pedestrian improvement |
|
To be refered to PAMP |
14. |
Leasing of parking from Granville RSL |
Parking |
Discussions are ongoing with the NSW Government regarding funding for commuter parking in Granville |
To be referred to MoT to be considered in Interchange upgrade |
Ref |
Description |
Category |
Comments |
Next Steps |
15. |
At grade crossing at
Corner Railway and |
Pedestrian improvement |
Only necessary should overhead and southern ramp be removed |
To be referred to MoT to be considered in Interchange upgrade |
16. |
South Lane Kiss and Ride |
Parking |
|
To be considered in MoT Interchange upgrade and Hub Feasibility Study |
17. |
|
Public Transport |
Location of Taxi rank will be further considered in MoT Interchange upgrade |
To be considered in Stage 3 of South Street upgrade and MoT Interchange Upgrade |
18. |
Pedestrian |
Pedestrian improvement |
Connection to |
To be considered in MoT Interchange upgrade and Hub Feasibility Study |
19. |
3m Shared Pedestrian/Bicycle Path |
Pedestrian/ Cycling improvement |
Bridge difficult to negotiate for cycles and pedestrians |
To be referred to RTA and consider for inclusion in Bike Plan |
20. |
|
Pedestrian improvement |
|
To be referred to Traffic and Transport Services Manager |
Ref |
Description |
Category |
Comments |
Next Steps |
21. |
Good Street Footpath Widening (Streetscape Study) |
Pedestrian improvement |
Concept plans have been prepared and work is scheduled for 2011/12 subject to funding |
Continue to seek funding to complete all Granville BNP projects |
22. |
Cowper and |
Traffic |
|
To be referred to Traffic and Transport Services Manager for consideration by Traffic Committee |
23. |
New Road Connecting Cowper
& East Streets to |
Traffic |
These connections were considered in view of the Draft LEP 2008 |
To be referred to Land Use and Transport Planning Team for consideration with the LEP review |
24. |
New Road Connecting
Cowper (west of Bold) to |
Traffic |
These connections were considered in view of the Draft LEP 2008 |
To be referred to Land Use and Transport Planning Team for consideration with the LEP review |
25. |
Grade Separated Railway Crossing |
Traffic |
|
To be referred to RTA, Railcorp & MoT Metro West Team |
26. |
Bicycle Storage Corner Bold, Railway & Carlton Streets |
Cycling improvement |
|
Include in Bike Plan |
27. |
Duck Creek – Pedestrian Footbridge |
Pedestrian Improvement |
|
To be referred to Open Space and Natural Resource |
Ref |
Description |
Category |
Comments |
Next Steps |
28. |
|
Traffic |
This was considered
in community consultation for the |
Stage 3 is part of the rolling works program for 2009/10 and subject to a funding application with the Federal Government |
29. |
|
Pedestrian improvement |
This was considered
in community consultation for the |
This will begin construction in 2009. |
30. |
Freight Train
movements across |
Traffic |
Freight Train movements in peak times causes major disruption |
To be referred to Railcorp & RTA |
31. |
Eastern access to M4
from |
Traffic |
Submission has been
made to Infrastructure |
Included in Integrated Transport Plan |
32. |
South Western Access
to M4 from |
Traffic |
Submission has been
made to Infrastructure |
Included in Integrated Transport Plan |
33. |
Cease Toll Collection on M4 |
Traffic |
Council resolution |
|